For GPU inference, 95th percentile transit beats per-GB egress once you're serving images, audio, or video. A 1 Gbps commit on AS36824 at IDACORE Depot 01 costs $600/month whether you push 20 TB or 100 TB, as long as your 95th percentile stays under the commit. Hyperscaler egress bills every gigabyte. For text-only LLM serving, egress barely matters.

What Does Inference Traffic Look Like on the Wire?

Most egress cost analysis was written for SaaS apps and video streaming. Inference is its own animal, and the output modality decides almost everything.

Text generation is tiny. A streamed token over server-sent events, wrapped in JSON framing, lands somewhere around 100–200 bytes on the wire. Run 500 million output tokens a day and you're moving roughly 75 GB daily, which comes to a bit over 2 TB a month. That's nothing. A 100 Mbps commit handles it with room to spare.

Pixels are a different story. A generated image as WebP or PNG runs 0.5–2 MB. TTS output is a steady audio stream. Video generation is measured in tens of megabytes per clip. At the same request volume you're now moving terabytes per day. Every output is unique, so your CDN cache hit rate sits near zero. You can't cache your way out of inference egress the way you can with static assets.

Then there's the operational traffic nobody budgets for:

  • Model weight pulls. A large checkpoint can run hundreds of GB, and every node pulls it on every rollout.
  • Rollbacks and A/B deployments that pull a second set of weights while the first is still serving.
  • Logs, telemetry, and eval exports shipped back to wherever your team does analysis.
  • Renter downloads of fine-tuned weights and datasets, if you're a GPU marketplace host.

The shape matters as much as the volume. Inference traffic follows your users. You get diurnal peaks, a quiet overnight trough, and short spikes when a product launches or a deployment fans weights out across the fleet. That's exactly the traffic pattern 95th percentile billing was designed for.

How Does 95th Percentile Billing Work?

Your port gets sampled every five minutes. A 30-day month produces 8,640 samples. Sort them and throw out the top 5%, which is 432 samples or 36 hours of your busiest traffic. The highest remaining sample is your billable rate.

Three things fall out of that math:

  1. Short bursts are free. A four-hour weight rollout that saturates your link doesn't move your bill. You get 36 hours of burst every month before peaks start counting.
  2. Volume inside your commit doesn't cost extra. Push 20 TB or 100 TB. If the 95th percentile lands under your commit, the invoice is the same.
  3. You can forecast it. Your bill follows your sustained peak, which you can see on a graph. It doesn't follow how successful you were last month.

Most transit providers sample both directions and bill the higher of inbound or outbound. That matters for upload-heavy inference, like speech-to-text or vision models chewing through customer images, where inbound dominates. Hyperscalers don't charge for ingress, so the per-GB comparison is closer for those workloads than it is for generative output. Know which side of the link your traffic lives on before you run numbers.

How Do You Estimate Your Own 95th Percentile?

If you have five-minute interface counters from SNMP, your router, or exported flow data, this gives you a p95:

# samples.txt: one 5-minute average rate in Mbps per line (8,640 lines for 30 days)
sort -n samples.txt | awk '{a[NR]=$1} END {print "p95 Mbps:", a[int(NR*0.95)]}'

If all you have is a cloud bill, convert it. One TB per month works out to about 3.1 Mbps averaged over 30 days. Multiply your monthly egress in TB by 3.1 to get average Mbps, then multiply by your peak-to-average ratio. For consumer-facing inference, 2–3x is a sane starting assumption. B2B APIs with batch jobs usually run flatter. Then pick the commit tier that leaves you headroom above that number. If your sustained p95 starts crowding the commit, that's your signal to step up a tier.

What Does Per-GB Egress Cost Compared to Committed Transit?

Here's a worked example. Take an image-generation API on a single 50kW rack at Depot 01, running three 8-GPU B200-class servers. It serves about 2 million images a day at an average of 1.2 MB each.

  • Daily egress: 2.4 TB
  • Monthly egress: about 72 TB
  • Average rate: about 222 Mbps
  • 95th percentile at a 2.5x peak-to-average ratio: about 555 Mbps

That fits in a 1G commit, which is $600/month on IDACORE transit. Now price the same 72 TB at typical hyperscaler list rates: $0.09/GB for the first 10 TB, $0.085/GB for the next 40 TB, and $0.07/GB for the next 100 TB. That comes to roughly $5,840 a month. Same bytes, same users, almost ten times the bill. That figure also leaves out cross-zone transfer and NAT gateway processing, which hyperscalers meter per-GB on top.

Now scale it across workload types. The hyperscaler figures below are typical published list rates for internet egress, not negotiated pricing. Commit sizing assumes a 2.5x peak-to-average ratio.

Workload Monthly egress Est. 95th percentile Typical hyperscaler egress (list) IDACORE transit commit
Text LLM API, 500M tokens/day ~2.25 TB ~17 Mbps ~$195 100M: $170/mo
Image generation, 2M images/day ~72 TB ~555 Mbps ~$5,840 1G: $600/mo
TTS / short-form video generation ~250 TB ~1.9 Gbps ~$16,300 10G: $2,000/mo
GPU marketplace host, mixed ~1 PB ~7.7 Gbps ~$53,800 10G: $2,000/mo

Read that table honestly. The text row is a wash. If you're serving pure text completions, egress isn't your problem, and anyone who tells you to move for bandwidth savings alone is selling something. Your reasons to move are GPU cost, power, and control.

The pixel rows are a different conversation. Per-GB billing punishes success. Every new customer, every viral week, and every higher-resolution model adds directly to the invoice. On a commit, the same growth just fills headroom you already paid for. At the marketplace row you'd want to watch that headroom closely, since a 7.7 Gbps p95 sits close to a 10G commit. Stepping to 100G at $11,050/month is still a fraction of the per-GB number.

What Do You Get for Bandwidth at IDACORE Depot 01?

Depot 01, our pilot site in Northeast Washington, is live and energized right now. It offers air-cooled GPU colocation at up to 50kW per rack, enough for three 8-GPU B200-class servers. Racks are powered in under two weeks from signing and carry a 99.9% uptime SLA. IP transit from AS36824 is delivered on-site.

That last part is the point of this post. We don't resell somebody else's transit at a Depot. AS36824 is our network, with Lumen and Cogent upstreams. The people making routing decisions on it have been doing that work since we founded and ran an ISP and peered at the Seattle Internet Exchange. Say your inference traffic takes a bad path to a big eyeball network. You'll be talking to an engineer who can look at the routing table and fix it, instead of filing a ticket that waits behind ten thousand others.

Here's what's on offer:

  • BGP sessions, so you can announce your own prefixes
  • IPv4 and IPv6
  • 1G, 10G, and 100G handoffs
  • Commits from 100M to 100G, billed at the 95th percentile

How Does Depot Pricing Break Down?

Colocation is $175/kW/month NNN on a 36-month term, covering space, cooling, and facility infrastructure. Power bills on top at cost: metered IT load times PUE at the utility rate, with no markup. Transit is a separate line, priced by the commit tiers above. Backup power, either UPS plus generator or battery storage, is available as an add-on, along with transport and remote hands. You can power-cycle your own gear from the IDACORE portal. Each of those lines is fixed and predictable, and none of them run on a per-GB meter.

Why Do Many Small Depots Beat One Big Campus for Inference?

The hyperscale playbook says to build one enormous campus and make it bulletproof. We think that's the wrong shape for inference in 2026. A Depot is a small site, typically about 1MW of IT load, built where the utility already has power. There's no years-long substation project, so Depots energize fast. Cattle, not pets: no single site is gold-plated, and the platform is resilient as a whole.

That lets you pick the resilience you need. You can run on the utility-fed base tier and spread replicas across Depots for site-level redundancy. Or you can add backup power at one site. Inference serving is mostly stateless, so this works well. If a replica drops, your load balancer routes around it.

The next Depots are planned for the Treasure Valley and Eastern Oregon, connected back to our Boise interconnect hub over metro fiber. Dark fiber between Depots is a long-term plan, not something that exists today. For now, each Depot gets transit from AS36824 on-site. For current availability, check idacore.com/depots.

Frequently Asked Questions

How much does IP transit cost at an IDACORE Depot?
IDACORE IP transit from AS36824 is priced on committed bandwidth with 95th percentile billing: 100M is $170/month, 1G is $600/month, 10G is $2,000/month, and 100G is $11,050/month. Transit is billed separately from colocation, which is $175/kW/month NNN plus power at cost. Handoffs are available at 1G, 10G, and 100G, with BGP and IPv4/IPv6 supported. Traffic that stays within your commit carries no per-GB egress charge.

How is 95th percentile bandwidth billing calculated?
Your port is sampled every five minutes, which gives 8,640 samples in a 30-day month. The samples are sorted, the top 5% are discarded, and the highest remaining value is your billable rate. That means 432 samples, about 36 hours of your busiest traffic, never count toward the bill. Most transit providers measure inbound and outbound and bill the higher of the two. Short bursts, like model weight rollouts, usually don't move the invoice.

Is 95th percentile transit cheaper than AWS egress for AI inference?
For image, audio, and video inference, almost always. Serving about 72 TB a month of generated images costs roughly $5,840 at typical hyperscaler list egress rates. The same traffic fits a 1G commit at $600/month on IDACORE transit. For text-only LLM APIs the gap closes: about 2 TB a month of streamed tokens runs roughly $195 at list rates, versus $170/month for a 100M commit. Upload-heavy workloads narrow it further, since hyperscalers don't charge for ingress.

Can I announce my own IP space at IDACORE Depot 01?
Yes. IDACORE transit at Depot 01 supports BGP over AS36824, with Lumen and Cogent as upstreams, so you can announce your own prefixes. IPv4 and IPv6 are both supported, with 1G, 10G, and 100G handoffs. IDACORE's own engineers run the network. It's the same team that founded and ran an ISP and peered at the Seattle Internet Exchange, so your routing questions go to people who manage the routing table directly.

How fast can I get a GPU rack with bandwidth in Northeast Washington?
IDACORE Depot 01 in Northeast Washington is live now, and racks are powered in under two weeks from signing. Each rack supports up to 50kW of air-cooled load, which is enough for three 8-GPU B200-class servers. Racks come with a 99.9% uptime SLA and IP transit delivered on-site. Pricing is $175/kW/month NNN plus power at cost on a 36-month term, with deposit and first month due at signing. Check idacore.com/depots for current availability.

If your inference bill has a per-GB line that grows every time your product does, run your numbers against a fixed commit. Depot 01 is live in Northeast Washington with transit from our own ASN delivered on-site, so the same operator runs your racks and your routing. Get a Depot 01 rack and transit quote sized to your 95th percentile.