IDACORE

Three data centers in the Pacific Northwest.
Per-U colocation, megawatt AI capacity, and cloud — no minimums,
no long-term lock-in, no hyperscaler markup.

BOISE
Boise, Idaho
Full details →

Downtown Boise. No one else is doing this.

The only per-U colocation in Boise. Bring one server or fill a cabinet — no minimum power commitments, no long-term contracts required. VPS and cloud services available. Access to Boise's full carrier ecosystem.

1U
Minimum Unit
12mo
Standard Term
1.4MW
Facility Power
7
On-Net Carriers
EAST
Eastern Oregon
Full details →

True dual-source power. No compromises.

Built for AI companies deploying at low megawatt scale who require genuine power redundancy. Grid and gas true 2N — not just generator backup. Liquid cooling throughout. Five diverse fiber routes, with dark fiber interconnects to IDACORE Boise and IDACORE North.

2N
True Redundancy
5
Fiber Routes
$250
Per kW/mo
MW+
Available Scale
NORTH
Coeur d'Alene
Full details →
ACCEPTING PRE-ORDERS

Medium density. Close to Spokane. A real second site.

A full-service colocation facility 45 minutes from Spokane. Medium density per-cabinet and per-U options, IP transit, and VPS planned as the second cloud location after Boise. Purpose-built for disaster recovery and regional redundancy.

1U
Minimum Unit
~45min
From Spokane
DR
Ready

We built what was missing in the Pacific Northwest.

Start with one server

Other providers require multi-kilowatt minimums before you can plug anything in. We start at a single U. Pay for what you actually use.

No long-term lock-in

No 36-month minimums. When your infrastructure needs change, you're not stuck paying for a contract you signed three years ago.

Someone picks up the phone

We're in Boise. Local support means a human who knows your rack — not a ticket queue routed through three time zones.

30–40% less than hyperscalers

Hyperscalers price for global margins and multi-region overhead. We price for the Pacific Northwest — same reliability, better latency, lower cost.

What buyers ask most.

What data centers does IDACORE operate?

Three locations: IDACORE Boise (2653 S Victory View Way, Boise, Idaho — per-U colocation and VPS), IDACORE East (Eastern Oregon — megawatt AI/HPC colocation targeting Q4 2026), and IDACORE North (2115 N Government Way, Coeur d'Alene, Idaho — colocation and disaster recovery).

What is the minimum colocation commitment at IDACORE?

At IDACORE Boise and North, the minimum is one rack unit (1U) on a 12-month term with no minimum power commitment. IDACORE East is built for megawatt-scale AI with a 1MW minimum at $250/kW/month.

Does IDACORE support AI or GPU colocation?

Yes. IDACORE East is purpose-built for megawatt-scale AI with true 2N power (grid + gas), direct-to-chip liquid cooling at 120kW/cabinet for NVIDIA GPU clusters, and five diverse fiber routes — at $250/kW/month all-in, 1MW minimum, targeting Q4 2026.

How does IDACORE pricing compare to AWS or Azure?

IDACORE VPS starts at $10/month and runs 30–40% below equivalent AWS or Azure instance pricing. Colocation at Boise starts at $125/U/month. Sub-5ms latency to Treasure Valley businesses.

Is IDACORE certified for healthcare or financial workloads?

Yes. IDACORE Boise holds SOC 2 Type II, PCI DSS, NIST 800-53, SSAE-16, and HITRUST CSF certifications — suitable for healthcare (HIPAA-ready), financial services, and government workloads.

Ready to stop paying coast prices for Idaho infrastructure?

GET STARTED →