Owning B200s vs. Renting Them: A 2026 Depot Break-Even Model

November 26, 2026 · 11 MIN READ

Owning B200s beats renting once the GPUs stay busy. In our model, an 8-GPU B200-class server at IDACORE Depot 01 costs about $2.92 per GPU-hour over 36 months, with the hardware fully paid off. It pays back in roughly 7 months against hyperscaler on-demand rates, 18 months against neocloud on-demand, and 28 months against committed neocloud contracts.

What Goes Into an Honest Ownership Model?

Rental math is easy because you read it off a pricing page. Ownership math is where teams fool themselves. They forget power. They forget transit. They assume 100% utilization. They also ignore the months the hardware sits in boxes waiting for a rack.

So here's the model with conservative assumptions. Where a choice could flatter the result, I picked the pessimistic option.

  • Hardware: One 8-GPU HGX B200-class server with NICs and optics at $450,000. Street pricing has run from roughly $400K to over $500K depending on configuration. It's amortized straight-line over 36 months with zero residual value.
  • Draw: About 14.3 kW at peak and about 12 kW sustained under a steady inference load.
  • Colocation: IDACORE Depot 01 at $175/kW/month NNN on a 36-month term. I budgeted against the full 14.3 kW peak, not the average.
  • Power at cost: Metered IT load × PUE × utility rate, with no markup. I used a PUE of 1.2, the top of the Depot design target of 1.1–1.2.
  • Utility rate: $0.11/kWh. That's about the national average commercial rate and roughly double Idaho Power's ~$0.055. I chose it as a deliberately pessimistic stand-in. Your quote shows the real pass-through rate.
  • IP transit: A 1G commit from AS36824 at $600/month, billed at the 95th percentile.
  • Remote hands: Two business hours a month at $150/hr, so $300.
Line item Calculation Monthly
Hardware amortization $450,000 ÷ 36 $12,500.00
Depot colocation (NNN) 14.3 kW × $175 $2,502.50
Power at cost 12 kW × 730 h × 1.2 × $0.11 $1,156.32
IP transit 1G commit $600.00
Remote hands 2 hrs × $150 $300.00
Total $17,058.82

That's 5,840 GPU-hours a month (8 GPUs × 730 hours), which works out to $2.92 per GPU-hour at full utilization.

Look at where the money goes. Hardware is 73% of the total. Power is under 7%. If you drop the utility rate to $0.055/kWh, the cost moves to $2.82 per GPU-hour, a difference of ten cents. Utilization dominates this model, and the power rate is a rounding error by comparison. That's the most important thing to take away before you argue about cents per kWh.

If you want to run your own inputs, the logic fits in a few lines:

def owned_cost_per_gpu_hour(capex, months, kw_budget, kw_avg, kwh_rate,
                            pue=1.2, transit=600, hands=300, gpus=8):
    hours = 730
    colo = kw_budget * 175                       # $175/kW/month NNN
    power = kw_avg * hours * pue * kwh_rate      # at cost, no markup
    monthly = capex / months + colo + power + transit + hands
    return monthly / (gpus * hours)

print(owned_cost_per_gpu_hour(450_000, 36, 14.3, 12, 0.11))  # ~2.92

Where's the Break-Even Against Renting?

Rental pricing for B200s moves fast, so treat the figures below as typical market rates in early 2026, not quotes. Hyperscaler on-demand has run roughly $10–14 per GPU-hour. Neocloud on-demand has run about $4–6. Committed one-to-three-year neocloud contracts sit around $3–4. I used the midpoints.

Rental option (typical market rate) 8 GPUs, 24/7, monthly Payback on $450K server Break-even utilization
Hyperscaler on-demand (~$12/GPU-hr) $70,080 6.9 months 24%
Neocloud on-demand (~$5/GPU-hr) $29,200 18.3 months 58%
Neocloud committed (~$3.50/GPU-hr) $20,440 28.3 months n/a (fixed vs. fixed)

Payback is the $450K capex divided by the monthly rental bill minus the ~$4,560 of Depot operating costs. Break-even utilization is the owned monthly cost divided by what 24/7 rental would cost.

The committed row deserves a closer look. A reserved contract bills you whether the GPUs are busy or idle, just like owned hardware. Over 36 months, the owned server costs $614,118 all in, while the committed contract costs $735,840. That's about $121,700 saved per server, and you still own a B200 at the end. Against on-demand neocloud, the 36-month gap widens to roughly $437,000.

Here's the plain version:

  • Above ~60% busy: Owning wins against everyone.
  • Between 25% and 60%: Owning beats hyperscalers but not flexible neocloud capacity.
  • Below 25%: Keep renting.

What Changes at Full-Rack Scale?

A Depot rack takes up to 50kW air-cooled. That's room for three of these servers at a 42.9 kW peak budget. The numbers per server improve slightly:

  • Colocation: $7,507.50
  • Power: $3,468.96
  • Transit: A step up to a 10G commit at $2,000, which is $0.20/Mbps versus $0.60/Mbps on 1G
  • Remote hands: $300

That's $13,276.46 a month to operate 24 GPUs. With amortization included, it comes to $2.90 per GPU-hour.

What About Egress?

The rental figures above don't include hyperscaler egress, which typically runs $0.05–0.09/GB. A 1G transit commit moves about 320 TB a month if you run it flat out. Moving that volume through per-GB egress puts you in five-figure monthly territory.

Text inference is light on bandwidth. Image, video, and embedding pipelines aren't. Committed transit at the 95th percentile stays flat as your traffic grows. Egress billed per GB gets more expensive the more successful you are.

What Does This Model Leave Out?

A model you can't poke holes in is a sales pitch. Here's what I left out, and which way each item pushes the result.

  • Residual value (favors owning): I assumed the server is worth nothing at month 36, and it won't be. Every dollar of resale comes straight off the capex.
  • Financing (favors renting): If you borrow to buy, add the interest. Leasing spreads out the capex but adds cost.
  • Your people (favors renting): Someone has to own drivers, firmware, the inference stack, and RMAs. Bare-metal neocloud rentals hand you most of that work anyway, so the gap is smaller than it looks.
  • Failures and spares (favors renting): A dead GPU or baseboard takes a node offline. Budget N+1 nodes, not N. Most hangs don't need a ticket, because you power-cycle your own gear from the IDACORE portal. Physical work is $150/hr during business hours in 15-minute increments, and $250/hr after hours with a 1-hour minimum.
  • Term length (favors owning on 36 months): The $175/kW rate is for a 36-month term. 12- and 24-month terms cost more per kW. I matched the amortization period to the term on purpose.
  • Backup power (neutral): The base tier is utility-fed. UPS plus generator, or battery storage, is available as an add-on and is priced separately. It isn't in this model.

Why Does Speed to Power Change the Math?

This is the cost almost nobody models: the wait.

A $450K server sitting in its crate depreciates at $12,500 a month. Meanwhile, you're still paying for rented GPUs to serve your traffic. Suppose your alternative is waiting a quarter for power at a large campus. That's $37,500 of depreciation plus roughly $87,600 of neocloud on-demand rental. You'd spend $125,100 before the server serves a single token. Sound familiar? That number alone can wipe out most of the first-year savings.

Depot 01 in Northeast Washington is live now. It's energized, air-cooled up to 50kW per rack, and racks are powered in under 2 weeks from signing. It carries a 99.9% uptime SLA, and IP transit from AS36824 is on-site with 1G, 10G, or 100G handoffs.

Depots are fast because they're small. Each one is 5MW or less, typically about 1MW of IT load, and sited where the utility already has power. Power comes from IDACORE's own transformer on a utility primary feed, delivered to the cabinet at 415V. There's no years-long substation project to wait on.

Cooling is cross-flow free air through MERV 13 filtration, with an evaporative wet wall for summer and no compressors or chillers. That design is why the power-at-cost line in the model stays small.

How Do You Get Resilience Without Gold-Plating a Site?

The philosophy is cattle, not pets. No single Depot is gold-plated. The platform is resilient as a whole, and inference fleets fit that model well because replicas are stateless and interchangeable.

You pick the resilience you need:

  • Run on the utility-fed base tier.
  • Add UPS plus generator, or battery storage.
  • Spread replicas across multiple Depots as more come online.

The next Depots are planned for the Treasure Valley and Eastern Oregon. They'll connect back to our Boise interconnect hub over metro fiber.

You're also working with a local operator. The people who built the site answer the phone. We've run our own ASN and peered at the Seattle Internet Exchange, so routing and capacity questions get answered by the people who make those decisions. If your workload changes mid-contract, you're having a conversation, not filing a ticket into a queue.

Frequently Asked Questions

How much does B200 colocation cost at IDACORE Depots?
IDACORE Depots charge $175/kW/month NNN on a 36-month term, covering space, cooling, and facility infrastructure. Power is billed on top at cost: metered IT load times PUE at the utility rate, with no markup. An 8-GPU B200-class server budgeted at 14.3 kW runs $2,502.50/month before power. IP transit, remote hands, and optional backup power are billed separately. There's no minimum deployment size, and the deposit and first month are due at signing. 12- and 24-month terms are available at a higher rate.

At what GPU utilization does owning B200s beat renting them in the cloud?
In our model, an owned 8-GPU B200-class server at IDACORE Depot 01 costs about $2.92 per GPU-hour over 36 months, including hardware, colocation, power, transit, and remote hands. That breaks even at roughly 24% utilization against hyperscaler on-demand rates near $12 per GPU-hour, and about 58% against neocloud on-demand near $5. Against committed neocloud contracts near $3.50, both costs are fixed, so owning saves roughly $121,000 per server over three years and you keep the hardware.

Can an air-cooled rack handle three 8-GPU B200 servers?
Yes. IDACORE Depot 01 delivers air-cooled capacity up to 50kW per rack. That's enough for three 8-GPU HGX B200-class servers at roughly 14.3 kW peak each, about 43 kW total. Cooling is cross-flow free air through MERV 13 filtration, with a direct evaporative wet wall for summer and no compressors or chillers. Cabinets are 48 inches deep with A+B PDUs (C13/C19), fed at 415V from IDACORE's own transformer on a utility primary feed.

How fast can I get GPU servers powered at IDACORE Depot 01?
Depot 01 in Northeast Washington is live and energized now. Racks are powered in under 2 weeks from signing and backed by a 99.9% uptime SLA. IP transit from IDACORE's AS36824 is delivered on-site in 1G, 10G, or 100G handoffs with 95th-percentile billing. That speed matters. A $450,000 server waiting on power loses about $12,500 a month to depreciation. Check idacore.com/depots for current availability.

What happens to my GPU workload if a Depot loses utility power?
The base Depot offering is utility-fed with no UPS or generator. It's the lowest-cost tier and is covered by the 99.9% uptime SLA. If your workload needs ride-through, UPS plus generator or battery energy storage (BESS) is available as an add-on. For stateless inference, you can also run replicas across multiple Depots. The next Depots are planned for the Treasure Valley and Eastern Oregon, connected back to IDACORE's Boise interconnect hub over metro fiber.

If your GPUs are busy more than half the day and you're still paying by the hour, plug your own numbers into this model. Then get a B200 rack quote for Depot 01. Racks are powered in under two weeks from signing, so your hardware starts serving traffic instead of depreciating in a crate.